In the tower crane lifting parts, the largest number, strict technical requirements and complex specifications are steel wire ropes. The wire rope is usually made up of a strand of fine steel wire with a diameter of 0.3-0.4mm and then twisted into a rope.


According to different functions, the steel wire ropes for tower crane are: hoisting steel wire rope, luffing steel wire rope, boom pulling rope, balance arm pulling rope, trolley traction rope, etc.


The characteristics of the steel wire rope are: the strength of the whole rope is high, the cross section of the whole rope is the same size, the strength is the same, the self weight is light, it can bear the vibration load, the elasticity is large, it can be wound into a disk, it can balance the movement at high speed, and it has no noise, after wear, its outer skin will produce many burrs, which is easy to find and easy to handle in time.




(2) Luffing trolley




The luffing trolley of tower crane is an essential part of horizontal boom tower crane. The whole set of luffing trolley is composed of frame structure, steel wire rope, pulley, traveling wheel, guide wheel, steel wire rope supporting wheel, steel wire rope anti falling roller, trolley traction rope tensioner and rope breaking protector. For the extra long horizontal boom (more than 50m in length), a maintenance basket shall be hung on one side of the luffing trolley, which can carry maintenance personnel to each maintenance point for maintenance. After the operation, the trolley drives back to the root of the boom, uncoupling the cradle and the luffing trolley, and fixing it at the special support on the boom structure.




Other components of tower crane include pulley, slewing ring, hook and brake, which are not detailed here.

L46A1 Mast Section

http://www.towercranesupply.com/product/l46a1-mast-section-for-tower-crane-masts

L46A1 Mast

Obter o preço mais recente? Responderemos o mais breve possível (dentro de 12 horas)

Política de Privacidade